Archive Record
Images
Additional Images [25]
Metadata
Catalog number |
2014.2.304 |
Object Name |
Timesheet |
Date |
1941 |
Description |
Employees' Daily Time Slip for June 1, 1941 through June 15. This record is one of 15 payroll records which are part of one archive item which has been divided into daily records for online viewing. Employee's daily time sheet, New Almaden Corporation, June 3, 1941: P. Martin, #6, ship drawings, 7 hours L. V. Chancellor, #16, shower Evans house at house, 2 hours, repair truck #3 at shop, 4 hours, shop at shop, 2 hours T. Abercrombie, #4, shovel operation (ore) 17578 at 75', 3 hours, shovel operation waste at 75', 5 hours. Meter reading end of day: 1397 Jas. Schmidt, #10, operate shovel 17577 at 50' level, 7 hours, work ore shovel 17577 at 50' level, 1 hour, total 8 hours. Meter reading end of day: 1259 Douglas Gardeluis, #7, truck no 1, 44 loads waste at 75' level, 4 loads ore at 75' level, 8 hours. Meter reading end of day: 4560 Donald Field, #8, truck 6, 56 loads waste at 50 bench, 6 hours, 4 loads ore at 50 bench, 1 hour, panning for ore at 50 bench, 1 hour. Meter reading end of day: 889 Ted J. Backer, #11, put in shower at Evans house, 3 hours, repaired spring at #3 truck, 2 hours, repaired shovel 17577 at 50' level, 1 hour, repaired waste tank at plant, 2 hours, total 8 hours Marshall Loosley, #12, waste 48 at 75', 8 hours, ore 2 at 75' level. Meter reading end of day:4303 tr. no 2 R. Riordan, #15, dumped 31 loads of waste at 75' level, 4 hours, worked on #3 truck spring at shop, 4 hours. Meter reading end of day:4271 #3 Edward Grimmer, #18, truck #4, 49 loads waste at 75' bench, 2 loads ore at 75' bench, 8 hours. Meter reading end of day:5160 miles C. E. Evans, #19, firing kiln. Materials and supplies used: 90 cars of slag, 2 bottles today, 737 bottles todate, 39 bottles on hand Lestire Wicke, #21, framing ladder at camp, 8 hours Clinton Lane, #24, carpentr work at Evans house, 8 hours Gordon Anderson, #29, operate cat at 50 and 75' level, 5 hours, operate cat at 25' level, 3 hours. Materials and supplies used: 5 gal #30 tunal for Bak, 1 gas for start motor James Cartoni, #32, mucking at day tunnel, 2 hours, timbering at day tunnel, 6 hours. Materials and supplies used: we mucked 4 cars, 25'-8x8 for 133 board feet Walter Robb, #43, timber framing at Santa Rita shaft, 8 hours Andy Anderson, #20, ladders for Santa Rita shaft, 8 hours Louis J. Epinosa, #25, spilere and timbering at day tunnel, 6 hours, muckering at day tunnel, 2 hours, 8 total hours Jim Martarano, #26, firing kiln at kiln bldg, 8 hours. Remarks: 1 3/4 cars of dust, 7 cars of slag W. A. Sharp, #31, crusher, 8 hours F. J. Sherlock, #33, fire furnance at mill, 8 hours. Remarks: 2 cars of dust Wm. C. Sharp, #34, crusher at plant, 8 hours, 4-12 Henry L. Nehr, #35, cutting brush at camp, 8 hours Merl Clark, #36, grease man at shop, 8 hours Harold Lane, #37, carpentry work at Evans house, 8 hours Amos A. Lickfeldt, #38, 12 to 8am, firing kiln, 8 hours. Remarks: 1 3/4 cars of dust unloaded James Cann, #39, pulling slag at mill, 8 hours. Remarks: 82 cars of slag J. H. Halsey, #40, drafting at drafting office, 7 hours W. H. Wright, #41, digging pipe line, 8 hours Charles W. Bish, #42, truck 5, 63 waste 4 ore at 50, 8 hours. Meter reading end of day: 2145 Carl Lane, #30, carrying desk's at mitchell, 6 hours |
People |
Abercrombie, T. Anderson, Andy Anderson, Gordon Baker, Ted J. Bish, Charles W. Cann, James Cartoni, James Chancellor, L. V. Clark, Merl Espinosa, Luis (Louis) (Louis J.) Evans, C. E. Field, Don (Donald) Gardeluis, Douglas Grimmer, Edward Halsey, J. H. Lane, Carl Lane, Clinton Lane, Harold Lickfeldt, Amos A. Loosley, Marshall Martarano, Jim (James) Martin, P. Nehr, Henry L. Riordan, R. Robb, Walter Schmidt, Jim (Jas.) (James) Sharp, W. A. Sharp, Wm. C. (William) Sherlock, F. J. Wicke, Lester Wright, W. H. |
Cataloged by |
Lampe, Mitchell |
Collection |
Individual Donors 8 |