Archive Record
Images
Additional Images [21]
Metadata
Catalog number |
2014.2.296 |
Object Name |
Timesheet |
Date |
1941 |
Description |
Employees' Daily Time Slip for June 1, 1941 through June 15. This record is one of 15 payroll records which are part of one archive item which has been divided into daily records for online viewing. Employee's daily time sheet, New Almaden Corporation, June 11, 1941: P. Martin, #6, put in fuse box at Evans house, 2 hours; shop detail drawings 5 hours. L. V. Chancellor, #16, (back fuelring kiln at plant?) 5 hours; corners buldozer (?) at shop, 3 hours. T. Abercrombie, #4, shovel operation 17578 at 75, 2 hours; shovel instruction 17578 at 75, 6 hours. Meter reading end of day: 1450 Jas. Schmidt, #10, operate shovel 17577 at China, 7 hours; work on haul back cable at shovel 17577, 1 hour; total 8. Meter reading end of day: 1298. Douglas Gardeluis, #7, truck No. 1, working on truck, 1 hour; 20 loads waste at 75' level, 7 hours. Meter reading end of day: 4804. Donald Field, #8, Truck 6, hauling garbage at camp, 1 hour; 20 loads ore at china dump, 6 hours; 4 loads to bin, 16 loads to stockpile. shortening haul back cable on shovel, 1 hour. Meter reading end of day: 1057. Ted J. Baker, #11, repaired seal ring at kiln, 5 hours. build up bits for bulldozer, 3 hours. total 8. Marshall Loosley, #12, burned brush at hill, 6 hours; waste 15 at 75, 2 hours. Meter reading end of day: 4565 Tr. No. 2. Vic Myers, #14, Truck #5-21 ore at china dump 8 hours; 15 to S.P(stock pile) 6 to bin. Meter reading end of day: 2285 Edward Grimmer, #18, Truck #4 29 loads of waste at 75' bench, 8 hours. Meter reading end of day: 5435 miles C. E. Evans, #19, Firing Kiln, materials and supplies used: 38 cars of slag, 1 bottle today, 773 bottled to date, 84 bottles on hand. Remarks: down for 10 1/2 hrs dust seal and back feed repair Clinton Lane, #24, carpenter work at mens barrack, 8 hours Gordon Anderson, #29, operating cat at 75 level, 3 hours, plant to camp road, 5 hours James Cartoni, #32, timbering at day tunnel, 4 hours, mucking at day tunnel, 4 hours, Material and supplies used: 48 2x12 for 96 board ft, 7 3x6 for 10 1/2 board ft, 14 8x8 for 75 board ft, total 181 Walter Robb, #43, timber framing at Santa Rita shaft, 8 hours Louis J Espinosa, #25, mucking at day tunnel, 4 hours, timbering at day tunnel, 4 hours Jim Martarano, #26, firing kiln at kiln bld on the 8 to 4 shift, 8 hours. Remarks: 1 1/4 cars of dust W A Sharp, #31, chrusher, 8 hours S J Sherlock, #33, fire furnence at mill 12-8, 8 hours. Remarks: 4 1/4 cars of dust William C Sharp, #34, burning, 6 hours, repairing dust track, 2 hours Merl Clark, #36, grease man at shop, 8 hours Harold Lane, #37, carpenter work at mens barrack, 8 hours Amos A Lickfeldt, #38, firing kiln, 8 hours. Remarks: 3 1/2 cars of dust unloaded, 4 to 12 hour shift James Cann, #39, weed cutting at camp, 8 hours J H Halsey, #40, drafting at eng office, 7 hours W H Wright, #41, pulling slag at mill, 8 hours. Remarks: 35 cars Carl O'Laul, #30, ladder work cleaning up apt at camp, 6 hours |
People |
Abercrombie, T. Anderson, Gordon Baker, Ted J. Cann, James Cartoni, James Chancellor, L. V. Clark, Merl Espinosa, Luis (Louis) Louis J.) (Espinoza) Evans, C. E. Field, Don (Donald) Gardeluis, Douglas Grimmer, Edward Halsey, J. H. Lane, Clinton Lane, Harold Lickfeldt, Amos A. Loosley, Marshall Martarano, Jim (James) Martin, P. Myers, Vic. (Victor) O'Laul, Carl Robb, Walter Schmidt, Jim (Jas.) (James) Sharp, W. A. Sharp, Wm. C. (William) Sherlock, F. J. Wright, W. H. |
Cataloged by |
Lampe, Mitchell |
Collection |
Individual Donors 8 |