Archive Record
Images
Additional Images [23]
Metadata
Catalog number |
2014.2.300 |
Object Name |
Timesheet |
Date |
1941 |
Description |
Employees' Daily Time Slip for June 1, 1941 through June 15. This record is one of 15 payroll records which are part of one archive item which has been divided into daily records for online viewing. Employee's daily time sheet, New Almaden Corporation, June 7, 1941: P. Martin, #6, head frame drawings, 7 hours Carl Lane, #30, muckering ladders at lang lee shed, 6 hours T. Abercrombie, #4, shovel operation waste at 75', 1 hour, work on shovel 17518 at 75', 3 hours, trip to town, 4 hours. Meter reading end of day: 1421. Remarks: broke brake on dipper Jas. Schmidt, #10, operated shovel 17577 at shina, 8 hours. Meter reading end of day: 1279 Douglas Gardeluis, #7, truck no 1, 4 loads waste from 75' level, 10 loads ore to stockpile china dump, 4 hours, 1 load lumber to southern lumber, 3 hours. Meter reading end of day:4743 Donald Field, #8, truck 6, 28 loads ore from china dump, 13 loads to stockpile, 15 loads to bin, 8 hours. Meter reading end of day: 980 Ted J. Baker, #11, worked on differential #3 truck, 6 hours, straightened cal tie rod on pickup, 2 hours, 8 total hours marshall Loosley, #12, waste 5 waste at 75', 1 hour, ore 20 stockpile at china, 7 hoours, ore 2 at bin, 8 total hours. Meter reading end of day: 4464 truck no. 2 Vic Meyers, #14, truck #5-13 ore at china dump, 4 hours, worked on #5 at shop, 4 hours. Meter reading end of day: 2208 Edward Grimmer, #18, truck #4, 4 loads waste at 75' bench, 22 loads ore at china dump, 8 hours. Meter reading end of day: 5324 miles C. E. Evans, #19, firing kiln, 81 cars of slag. Materials and supplies used: 5 bottle today, 757 bottle to date, 3 rebottled(Schueider), 2 rebottled(Cheguire), 1/2 bottle in pot, 68 bottles on hand Lester Wicke, #21, timbering shaft at Santa Rita, 8 hours. Materials and supplies used: 2 8"x8"x16' for 171 board feet, 2 8"x8"x12' for 128 board feet, 1 6"x8"x16' for 664 board feet, 16 2"x12"x12' for 384 board feet, total 747 Clinton Lane, #24, carpentry work at mens barracks, 5 hours Gordon Anderson, #29, operate cat at track road, 7 hours, operate cat at ore track, normal slage, and dump, 1 hour James Cartoni, #32, timbering at day tunnel, 7 hours, muckering at day tunnel, 1 hour. Materials and supplies used: we muckered 2 cars Walter Robb, #43, timber framing at Santa Rita shelf, 8 hours Andy Anderson, #20, Santa Rita shelf, 8 hours Louis J. Epinosa, #25, muckering, 1 hour, timbering, 7 hours, 8 total hours Jim Martarano, #26, firing kiln at kiln bldg, 4 to 12, 8 hours. Remarks: 3 1/2 cars dust, 5 cars of slag W. A. Sharp, #31, chrusher, 8 hours F. J. Sherlock, #33, fire furnace at mill, 8 hours, 8-4. Remarks: 81 cars of slag and 4 1/4 dust, bottles 5, bottled Chervion 2, Schoriod 3 Wm. C. Sharp, #34, crusher at plant, 8 hours Merl Clark, #36, grease man at shop, 8 hours Harold Lane, #37, carpentry work at mens barraks, 4 1/2 hours Amos A. Lickfieldt, #38, firing kiln, 8 hours. Remarks: 4 1/2 cars dust unloaded, 12 to 8am shift James Cann, #39, windloss at Santa Rita shaft, 8 hours J. H. Halsey, #40, drafting at eng office, 8 hours W. H. Wright, #41, pulling slag at plant, 8 hours. Remarks: 76 cars Charles W. Bish, #42, repair crusher at plant, 2 hours, muckering behind condensor at plant, 6 hours, 8 total hours |
People |
Abercrombie, T. Anderson, Andy Anderson, Gordon Baker, Ted J. Bish, Charles W. Cann, James Cartoni, James Clark, Merl Espinosa, Luis (Louis) (Louis J.) Evans, C. E. Field, Don (Donald) Gardeluis, Douglas Grimmer, Edward Halsey, J. H. Lane, Carl Lane, Clinton Lane, Harold Lickfeldt, Amos A. Loosley, Marshall Martarano, Jim (James) Martin, P. Myers, Vic. (Victor) Robb, Walter Schmidt, Jim (Jas.) (James) Sharp, W. A. Sharp, Wm. C. (William) Sherlock, F. J. Wicke, Lester Wright, W. H. |
Cataloged by |
Lampe, Mitchell |
Collection |
Individual Donors 8 |